What was found
SHIP 3224 DURING TEST PSU AT ROW 26 L/H FAILED TO OPEN. CORRECTIVE ACTION: R/R PSU AT ROW 26 L/H PER A320 AMM 25-25-41. OPS CHK GOOD. (9887955)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHIP 3224 DURING TEST PSU AT ROW 26 L/H FAILED TO OPEN. CORRECTIVE ACTION: R/R PSU AT ROW 26 L/H PER A320 AMM 25-25-41. OPS CHK GOOD. (9887955)