What was found
SHIP 5803 CIRCUIT BREAKER -EMER CHGR- POPPED ON GROUND AT GATE. CORRECTIVE ACTION: CYCLED BOTH LEFT AND RIGHT EMER BATTERY CHARGER C/B'S AND PERFORMED OPS CHECK PER B757 AMM 33-51. OPS CHECK NORMAL. (4419182)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHIP 5803 CIRCUIT BREAKER -EMER CHGR- POPPED ON GROUND AT GATE. CORRECTIVE ACTION: CYCLED BOTH LEFT AND RIGHT EMER BATTERY CHARGER C/B'S AND PERFORMED OPS CHECK PER B757 AMM 33-51. OPS CHECK NORMAL. (4419182)