As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
SHIP 187 REPAIR WAS REQUIRED DUE TO A CRACK IN FRAME STA 720 AND COMPLETED PER ERA 615867-14. REPAIR APPROVAL IS LIMITED TO 12 MONTHS SERVICE ONLY. ADDITIONAL ENGINEERING AUTHORIZATION (ER/A REVISION) IS REQUIRED FOR CONTINUED SERVICE BEYOND THIS LIMIT. CORRECTIVE ACTION: DISCONTINUE REVENUE SERVICE BEFORE 13FEB25 (0200024)