What was found
SHIP 3318 DURING BOARDING PROCESS THE JETWAY ADJUSTED AND CONTACTED THE BOTTOM OF L2 DOOR - DAMAGING THE DOOR HINGES. REMOVED L2 DOOR SLIDE PER A330 AMM 25-62 REMOVED L2 DOOR AND DOOR HINGE ARM PER AMM 52-12 (445487) INSTALLED L2 DOOR SUPPORT ARM PUSH BUTTON, DOOR STAY MECHANISM, AND DOOR BUFFER PER AMM A330 52-10-41 (587691) REMOVED AND REPLACED UPPER HINGE BOLT ( DOOR SIDE) TRANSFERRED AND INSTALLED LOWER SIDE HINGE BOLT PER AIRBUS CMM 52-10-41. R/R ROD END BOLT FOR EMERGENCY OPERATION CYLINDER PER AMM 52-10-14 THROUGH STEP 4D (4) . INSTALLED L2 DOOR DAMPER & EMER OPS CYLINDER IAW AMM 52 -12-14 STEP 4G (2)(G). INSTALLED MID PAX DOOR (L2) THRU STEP 4.B. (2) IAW AMM 52-12-11. INSTALLED MID PAX DOOR (L2) STEPS 4B3, 4B4, AND 4( B) 7 IAW AMM 52-12-11 & THRU 4(D) (G) IAW AMM 52-12- 12. COMPLETED INSTALL DOOR DAMPER & EMER OPS CYLINDER IAW AMM 52-12-12 STEP 4D (2). COMPLETED INSTALL OF MID PAX DOOR (L2) THRU STEP 4. (B) IAW AMM 52-12-11. COMPLETED STEP 4D (1) IAW AMM A330-52-12-11. COMPLETED STEP 4D (2) IAW AMM 52-12-11. COMPLETED STEP 4 D (3) IAW AMM 52-12-11. COMPLETED SLIDE RELEASE ADJUSTMENT IAW AMM 52-12-22 THRU STEP 4 A. (16). COMPLETED STEPS 4A.17 THRU 19 IAW AMM 52- 12-22. COMPLETED STEP 4.B(1) THRU 5 IAW AMM 52-12-22. COMPLETED STEP 4D (4) IAW AMM 52-12-11. . COMPLETED INSTALL OF DOOR UP THRU STEP 5(A)(5) IAW AMM 52-12-11. INSTALLED SLIDE PER AMDS 2561-9403 & STEP 5.A. (6) OF AMM 52-12-11. COMPLETED INSTALLATION OF DOOR 2L.