Service difficulty report · Not Reported · Boeing 717200

Difficulty date
May 1, 2024
Submitted
May 2, 2024
Operation
Air carrier
Aircraft
N923AT
Make and model
Boeing 717200
Aircraft serial
55051
Aircraft time
44,579 hours, 31,353 cycles
Part
Not Reported
Part number
UNKNOWN
Condition
Scratched
Location
Horizontal Stab
Stage of operation
IN
How discovered
O
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

-AD- SCRATCHES WERE FOUND AT FWD/LH BARREL NUT HOLE HORIZONTAL STABILIZER. SUMMARY OF NRC 00666: FWD/LH BARREL NUT HOLE HORIZONTAL STABILIZER (HOLE #19) WAS REPAIRED PER PRI 617393-14 REV 1 AND ER/A 617393AD REV ORIG SECTION I: PERMANENT REPAIR. REPAIR APPROVAL IS LIMITED TO 24 MONTHS FROM 25-APR-2024. ADDITIONAL ENGINEERING AUTHORIZATION (ER/A REVISION) IS REQUIRED FOR CONTINUED SERVICE BEYOND THIS LIMIT. NOTE TO ENGINEER: DAMAGE TOLERANCE EVALUATION SECOND/THIRD STAGE IS REQUIRED IN ACCORDANCE WITH PROCEDURES ESTABLISHED IN FAA AC 120-93 PER ERA 617393-14AD REV ORIGINAL. LOG PAGE #0320071 REPAIR APPROVAL IS LIMITED TO 24 MONTHS FROM 02-APR-2024. ADDITIONAL ENGINEERING AUTHORIZATION (ER/A REVISION) IS REQUIRED FOR CONTINUED SERVICE BEYOND THIS LIMIT. NOTE TO ENGINEER: NEW AMOC TO AD 2004-03-21 PAR (B) IS REQUIRED PRIOR TO 24 MONTHS IN ACCORDANCE WITH PROCEDURES ESTABLISHED IN FAA AC 120-93. PER ERA 617393-14AD REV: ORIGINAL LOG PAGE #0320079. (LP #0321744)

More about the Boeing 717-200