What was found
-AD- PERFORM BALANCE PROCEDURE ON AILERON LH. SUMMARY OF NRC 00770: AILERON LH BALANCE PROCEDURE WAS PERFORMED PER B717-200 SRM 51-60-01-0G, ALSO AILERON LH WAS REMOVED / INSTALLED PER B717-200 AMM 27-10-01. ADJUSTMENT / TEST OK; AILERON CONTROL TAB L/H WAS REMOVED / INSTALLED PER B717-200 AMM 27-10-02. ADJUSTMENT / TEST OK; AND AILERON TRIM TAB L/H WAS INSTALLED PER B717-200 AMM 27-10-05. ADJUSTMENT / TEST OK. (LP #0257444)