What was found
SHIP 5814 -DIV/PRESS/DE- DUE TO LOSS OF PRESSURIZATION AFTER RIGHT BLEED SHUT OFF PER QRH DUE TO RIGHT BLEED DUCT MESSAGE AND SUBSEQUENTLY LEFT BLEED TRIP. CORRECTIVE ACTION: T/S RT PACK BAY AND FOUND SEVERAL DUCTS LOOSE / LEAKING, REPLACED UPPER DUCT. RPLCD MULTIPLE PERRY SEALS ON COUPLERS, DUCT OFF PACK A/I VLV AND SENSE LINE OFF REHEATER TO ACM. T/S R/R #1 PRSOV, SENSE LINE AND FITTING AND INLET PRESS SENSE LINE @PRSOV. R/R HP VALVE AND HP PILOT. ALL ENG 1 BLEED CKS GOOD.