What was found
(LOG 0466259) INITIAL INSPECTION: CORROSION ON FLOOR BEAM OF STA 947.5 BTW LBL 50 AND RBL 50. FLOOR BEAM OF STA 947.5 BTW LBL 50 TO RBL 50 WAS REPAIRED PER B737-800 SRM 53-70-51-2R PROCEDURE 5 REPAIR 5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(LOG 0466259) INITIAL INSPECTION: CORROSION ON FLOOR BEAM OF STA 947.5 BTW LBL 50 AND RBL 50. FLOOR BEAM OF STA 947.5 BTW LBL 50 TO RBL 50 WAS REPAIRED PER B737-800 SRM 53-70-51-2R PROCEDURE 5 REPAIR 5.