What was found
EVIDENCE OF LIGHTNING STRIKE 7 INCHES AFT OF STA 332 AT STRINGER 15 L REF LOG 8010442. REMOVED DAMAGED FASTENER AND INSTALLED TEMPORARY FASTENER PER B717 SRM 53-02-01-2R PARA 5 B (2) REPAIR 1. REQUIRES INITIAL VISUAL INSPECTION AT 3000 CYCLES. REPETITIVE INSPECTION EVERY 3000 CYCLES AND REPLACEMENT AT 8000 CYCLES. **REDEFERRED LOG TO QC, ESTAB MON INSP. COMPLY WITH REP INSP OF TEMPORARY FASTENER PER B717 SRM 53-02-01-2R PARA 5 B (2) REPAIR 1. NO CHANGE IN CONDITION. OK TO REMAIN ON MON. SUMMARY: TEMPORAL BLINF FASTENER WAS REPLACED BY SOLID FASTENER PER B717-200 SRM 53-02-01-2R-1 PAR 5.B.(2)(C) AND THE ORIGINAL PRODUCTION DRAWING ON 01AUG24. PLEASE CLOSE THIS LOG. (LP #8010455)