What was found
SHIP 5651 AFT CABIN STA. 1640 APROX LBL 15.0 WEB T. CHORD HAS CORROSION AT UPPER SURFACE DOT 11/032. CORRECTIVE ACTION: REMOVED PREVIOUS REPAIR AT AFT CABIN STA 1640 IAW B757-200 SRM 51-40-02. CUTOUT DAMAGE FLOOR BEAM UPPER CHORD AT MAIN CABIN STA 1640 IAW B757-200 SRM 53-00-51 REPAIR 9. FABRICATED AND INSTALLED NEW FLOOR BEAM TEE CAP AT STA 1640 LBL 65 TO RBL 65 IAW B757 SRM 51-40-02 AND B757 SRM 53-00-51-2R REPAIR 9. (0580916)