Service difficulty report · Spar · Boeing 717200

Difficulty date
October 28, 2024
Submitted
November 21, 2024
Operation
Air carrier
Aircraft
N977AT
Make and model
Boeing 717200
Aircraft serial
55036
Aircraft time
59,360 hours, 42,257 cycles
System (JASC)
5711 · Wing Spar
Part
Spar
Condition
Cracked
Location
Zone 500
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

-AD- LH WING REAR SPAR XRS 164 CRACKED. ADDITIONAL ENGINEERING AUTHORIZATION (ER/A REVISION) REQUIRED FOR CONTINUED SERVICE BEYOND 06NOV2024 (AD EFFECTIVE DATE). A NEW FAA FORM 8100-9 AND AMOC APPROVAL TO AD 2024-21-01 IS REQUIRED FOR CONTINUED SERVICE BEYOND THIS LIMIT. ASSOCIATED ER/A 14-615810 ADDED FOR AC 9541. ER/A 615810-14 IS CURRENTLY AT REVISION B. THE AMOC TRACKING TIME LIMIT IS CHANGED FROM 06NOV24 TO 22NOV24. ADDITIONAL ENGINEERING AUTHORIZATION (ER/A REVISION) REQUIRED FOR CONTINUED SERVICE BEYOND 22NOV24. A NEW FAA FORM 8100-9 AND AMOC APPROVAL TO AD 2024-21-01 IS REQUIRED FOR CONTINUED SERVICE BEYOND THIS LIMIT. ER/A 615810-14AD IS CURRENTLY AT REVISION C. AMOC TO AD 2024-21-01 APPROVAL RECEIVED AND INCORPORATED IN ER/A 615810-14AD REVISION C. CLOSED LOG AND REMOVED MONITOR INSP PER ALERT 18NOV24 AND LOG COMMENTS. (LP #0631778)

More about the Boeing 717-200