What was found
DENT ON LT VERTICAL STAB HAD TEMP REPAIR COMPLETED SRM 55-30-01-2R REPAIR 3 PROCEDURE 1. MONITOR NEEDS OPEN FOR PERMANENT REPAIR. "SUPPLEMENTAL INFO" SLN 02/21/25. CHANGED STAB DAMAGE LOCATION FROM LEFT SIDE TO CORRECT LOCATION AS RIGHT SIDE STAB. DUE TO ADDITIONAL INSPECTIONS REQUIRED, REMOVED DOUBLER FROM RIGHT SIDE VERTICAL STAB, FABRICATED REPAIR DOUBLER PER B737-800 SRM 55-30-01-2R REPAIR 3, INSTALLED DOUBLER PER B737-800 SRM 55-30-01-2R REPAIR 3. APPLIED DECORATIVE FINISH. DOUBLER INST. OK, RII COMPLETE.