What was found
LIGHTNING STRIKE FRAME 18 STRINGER 44 L/H. PERFORMED TEMP SKIN PROTECTION USING HIGH SPEED TAPE REF A350 ASR 53-21-61-00004-662-A-A FIG 10. PREVIOUS STEP MON REF ENTERED IN ERROR, REEVALUATED LIGHTNING STRIKE WHILE DOING REP INSP. PER A350-A-53-00-61-01001-661A-A , FOUND TEMP ALLOWABLE LIGHTNING STRIKE 7 DAY REINSPECTION OF SPEED TAPE NO LONGER REQUIRED. TERMINATING ACTION REQUIRED IN 600 FLIGHT CYCLES PER SAME REF. LOG-PAGE UPDATED @ 12DEC24 0533 UTC 15 DFRD BY HOGAN 00458844 ATL 31MAR25 ENTR 00275919 W LOG-PAGE UPDATED @ 31MAR25 0625 UTC 16 DFRD BY SUCHONIC 00478884 ATL 31MAR25 RII: N ENTR 00275919 W FOUND MINOR PITTING AT FASTENER TO BE WITHIN LIMITS. RESTORED FINISH PER ASR A350-A-53-00-61-01001-661A-A FIG 3. (458844) PLEASE TERMINATE MONITOR LOG-PAGE UPDATED @ 31MAR25 0625 UTC 17 CORR BY SKINNER 00894972 ATL 31MAR25 ATA 5331 RII: N ENTR 00894972 S CLOSED LOG AND REMOVED MONITOR INSP PER ALERT 31MAR25 AND LOG COMMENTS. (LP# 0640903)