What was found
PERFORM ER/A 631768-14AD FOR REPLACEMENT OF CONTINUITY FITTINGS LH AND RH ON AREA OF WINSHIELD CENTER POST LOWER ATTACHMENT. COMPLIED WITH ERA 631768-14AD REV. ORIGINAL; MATCHES WITH ALL STEPS ON ER/A 631768-14AD PRI REV.0 AND ER/A 631768-14AD PRI REV1. IT HAS BEEN VALIDATED. PERFORMED REPAIR INSTRUCTIONS SECTION I ON FRAMES AND FORMERS/WINSHIELD CENTER POST LOWER ATTACHMENT/CONTINUITY FITTINGS LH AND RH AS PER ER/A 631768-14AD REV ORIGINAL HAS BEEN COMPLIED WITH.SEE LOG PAGE 1478699 FOR TIMECONTROLLED ITEMS SECTION DTE, APPROVED DATE: 06-MAR-26. SEE INDIVIDUAL SIGN OFF ON ORNRC 168/200 RII INSPECTION COMPLETE. AE232QC. (LP: 1483009)