What was found
(UT) THICKNESS MEASUREMENT WAS ACCOMPLISHED ON LH SIDE PANEL FROM STA 1500+6 TO STA 1530 AT AFT CARGO COMPARTMENT, AREA IS OUT WITHIN LIMITS PER B757-300 SRM 53-00-53-1A PROCEDURE 1 ALLOWABLE DAMAGE 1 DETAIL III NOTE C. AND DETAIL IX. (CORROSION LEVEL 2) LH SIDE PANEL FROM STA 1500+6 TO STA 1530 AT AFT CARGO COMPARTMENT WAS REPAIRED PER B757-300 SRM 53-00-53-2R PROCEDURE 2, REPAIR 2. (1498262)