What was found
CORROSION OUT OF LIMITS IN STGR LBL 7.55, LBL 2.90, RBL 2.90, RBL 7.55, RBL 10.45 AND RBL 16.10 STA 1330 IAW SRM 53-00-53-1A PROCEDURE 1 ALLOWABLE DAMAGE 1 DETAIL III NOTA C DETAIL IX AND NDT-4-51-00-10 STEP 4. STGR LBL 7.55, LBL 2.90, RBL 2.90, RBL 7.55, RBL 10.45 AND RBL 16.10 STA 1330 WERE REPAIR PER SRM 53-00-53-2R-1- REPAIR 1. (1587520) AIRCRAFT WAS GROUNDED