Service difficulty report · Floor Support · Airbus A320212

Difficulty date
June 23, 2026
Submitted
June 24, 2026
Operation
Air carrier
Aircraft
N352NW
Make and model
Airbus A320212
Aircraft serial
778
Aircraft time
81,941 hours, 39,111 cycles
Part
Floor Support
Condition
Corroded
Location
Zone 200
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LEVEL 2 CORROSION, PPER FUSELAGE, AFT PAX CABIN, LONGITUDINAL FLOOR SUPPORT CORRODED AT Y1292, BETWEEN FR67 AND FR68. REPLACED LONGITUDINAL FLOOR SUPPORT AT UPPER FUSELAGE AFT PAX CABIN BETWEEN FR66 AND FR68 Y1292 IAW SRM 51-72-11-911-001 REV 158 AND DWG D53472800 AND D53472815. (LP: 1662504, AIRCRAFT WAS GROUNDED)

More about the Airbus A320-212