As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
ERA 611850-14 SECTION I ISSUED TO MTC DURING CHECK IN MSP. FOLLOW ON ACTION IS REQUIRED. WASTE AREA AFFECTED. ACCOMPLISH ERA 611850-14 SECTION II EVERY 1000 FH AFTER SECTION I. ERA 611850-14 SECTION I IS TIME LIMITED TO 10,000 FH. ERA 611 850-14 SECTION III WILL TRACK THIS LIMIT. THIS IS MAJOR REPAIR. SDR AND RII SHOULD BE YES. ASSOCIATED ER/A 00-611850 ADDED FOR AC 8301. (LP# 2958508; AIRCRAFT WAS GROUNDED)