What was found
LT FUSELAGE BODY FAIRING FOR THE NR 4 JACKSCREW AND ELEPHANT EAR FAIRING IS GOUGED IN 2 PLACES 16 INCHES FROM THE END. INSTALLED FIBERGLASS OVERLAY REPAIR PER SRM 51-40-8. SANDED AND PAINTED PER SRM 51-20-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LT FUSELAGE BODY FAIRING FOR THE NR 4 JACKSCREW AND ELEPHANT EAR FAIRING IS GOUGED IN 2 PLACES 16 INCHES FROM THE END. INSTALLED FIBERGLASS OVERLAY REPAIR PER SRM 51-40-8. SANDED AND PAINTED PER SRM 51-20-2.