As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
MAIN CARGO COMPT FLOOR TRACK RT LUGS WORN OUT AT STA 400.000. CUT OUT DAMAGED SECTION OF TRACK PER SRM 53-2-3. CONDITIONED NEW TRACK PER SRM 53-2-3. FABRICATED SPLICES PER SRM 53-2-3. TREATED AND PRIMED PER SRM 51-1-8B. INSTALLED TRACK AND SPLICES PER SRM 53-2-3.