What was found
MAIN CARGO COMPT 3D FLOOR CRACKED 1 INCH AT STA 724.00. STOP DRILLED PER SRM 51-1-21. FABRICATED DOUBLER PER SRM 53-2-3. CLEANED,TREATED AND PRIMED PER SRM 51-1-8. INSTALLED DOUBLER PER SRM 53-2-3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CARGO COMPT 3D FLOOR CRACKED 1 INCH AT STA 724.00. STOP DRILLED PER SRM 51-1-21. FABRICATED DOUBLER PER SRM 53-2-3. CLEANED,TREATED AND PRIMED PER SRM 51-1-8. INSTALLED DOUBLER PER SRM 53-2-3.