What was found
MAIN CARGO COMPT 2C FLOOR CRACKED. STOP DRILLED PER SRM 53-2-0. FABRICATED DOUBLER PER SRM 53-2-0. CLEANED, TREATED AND PRIMED PER SRM 51-1-8. INSTALLED DOUBLER ON CARGO FLOOR PER SRM 53-2-0.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CARGO COMPT 2C FLOOR CRACKED. STOP DRILLED PER SRM 53-2-0. FABRICATED DOUBLER PER SRM 53-2-0. CLEANED, TREATED AND PRIMED PER SRM 51-1-8. INSTALLED DOUBLER ON CARGO FLOOR PER SRM 53-2-0.