What was found
NR 2 PITCH TRIM DISCONNECTED TWICE IN FLIGHT. RESET OPS NORMAL. DEFERRED NR 2 PITCH TRIM IAW MEL 22-11-03. C/W S.P. 22-11-03-A.2. REMOVED AND REPLACED NR 2 PITCH COMPENSATION COMPUTER AND OPS CHECK OK PER 22-23-00.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 2 PITCH TRIM DISCONNECTED TWICE IN FLIGHT. RESET OPS NORMAL. DEFERRED NR 2 PITCH TRIM IAW MEL 22-11-03. C/W S.P. 22-11-03-A.2. REMOVED AND REPLACED NR 2 PITCH COMPENSATION COMPUTER AND OPS CHECK OK PER 22-23-00.