What was found
CENTER WING RT UPPER WALL OF RAM AIR PLENUM CHAMBER HAS SPOTS OF CORROSION APPROX BS 800. REMOVED CORROSION PER SRM 51-10-6. (MATERIAL LOSS 0.055 FOUND TO BE OUT OF LIMITS PER SRM 57-30-1 FIG 4. FLAP PEENED AREAS OF BLEND OUT PER SOP M-20-10-03. ACCOMP SHOT PEEN PER SRM 57-30-03. INSTALLED EXTERNAL REPAIR AT LOWER SKIN OF PLENUM PER SRM 57-30-03 FIG 8.