What was found
WHEN SETTING T/O THRUST NR 3 EPR GAUGE OVERSHOT EXPECTED SETTING WHEN ALL OTHER ENGINE INDICATIONS (NR 1, 2, 3) WERE EVEN. NR 3 N1 96.0, EGT 570, N2 96.8, FF 8400PPH MATCHED NR 1 ENG N1. DEFERRED PER MEL 77-1-1 CTRL NR 5594 CAT A. SEE RESTRICTIONS PLA INSTALLED. ENG TRIM SHEET GENERATED. R&R NR 3 EPR XMTR IAW B727 MM CHPT 77-11-11. PERFORMED P/P & T/O EPR CHECK IAW DHL JRH 7.7. OPS CHECK GOOD.