What was found
MAIN CARGO SUB FLOOR CRACKED .5 INCH AT STA 1540.000 RBL 10. STOP DRILLED CRACK PER SRM 53-2-0 FIG 18. FABRICATED DOUBLER PER SRM 53-2-0 FIG 18. INSTALLED DOUBLER PER SRM 53-2-0 FIG 1B.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CARGO SUB FLOOR CRACKED .5 INCH AT STA 1540.000 RBL 10. STOP DRILLED CRACK PER SRM 53-2-0 FIG 18. FABRICATED DOUBLER PER SRM 53-2-0 FIG 18. INSTALLED DOUBLER PER SRM 53-2-0 FIG 1B.