What was found
C-check/#2 pylon rib #22, rib is cracked at lower otb. corner.Corrective action/ reference pg. 2 rib removed & replaced,item #4.Fairing attach structure not required to remove & replace rib # 22 ref. pg. 2 item #4.Removal of angle not required for r&r of rib #22. Ref. pg. 2 item # 4. Removed rib # 22 IAW A300 SRM 51-30-30,located & drilled rib #22 IAW A300 SRM 51-30-30,ok to install,installed rib # 22 IAW A300 SRM 51-30-30.