What was found
AT THE BEGINNING OF THE TAKE-OFF ROLL THE GREEN SYSTEM (HYDRAULIC) LEVEL LOW LIGHT ILLUMINATED. THE TAKE-OFF WAS REJECTED AT 70 KNOTS, 260000 LBS, OAT 14ØC, -10 FT P.A., AND A MAXIMUM BRAKE TEMPERATURE OF 150ØC WAS REACHED. REPLACED BLOWN HOSE WITH LIKE UNIT. SERVICED GREEN SYSTEM AND PRESSURE CHECKED PER 29-21-00. NO LEAKS NOTED. MAX BRAKING, REJECTED TAKEOFF INSPECTION DUE. MAX BRAKE TEMPERATURE OF 450ØC NOT MET. INSPECTED BRAKES AND TIRE PLUGS IAW 32-41-00 AND 32-42-27. ALL SYSTEMS OK.