What was found
LT ELEV IS CORRODED/SPLITTING ALONG THE TE. REMOVED 2 EACH BASES AND 5 EACH STATIC ELEMENATORS FOM. REMOVED CORROSION IAW A300-B4-200 SRM 51-40-11, FOUND TO BE OUT OF LIMITS IAW A300 SRM 55-20-00. FABBED DOUBLER IAW A300 SRM 55-20-00. PAA'D DOUBLER IAW TPS-1001-REV E, PRIMED AREA, BONDED REPAIR, ALODINED REPAIR, EDGE SEALED, REINSTALLED 2 EACH BASES AND 5 EACH STATIC ELEMENATORS ALL IAW A300 SRM 55-20-00. PERFORMED ELECTRICAL CHECK IAW AMM 23-60-00.