What was found
FWD CARGO COMPT PRESSURE BULKHEAD INTERCOSTAL 1.000 AT L-31L, STA 70.000. STOP DRILLED CRACK AT L-31L, STA 70.000 AND FABRICATED DOUBLER IAW SRM 53-2-0 FIG 1B. CLEANED, TREATED AND PRIMED AREA IAW SRM 51-1-8B. INSTALLED DOUBLER IAW SRM 51-1-21 PG 1.