What was found
MAIN CARGO COMPT. FLOORBEAM INTERCOSTAL JOINT SHOWS STIFFENER CRACKED (1.000) STA.702.000 BL-0. PERFORMED MAJOR REPAIR IAW SRM 53-1-0 PG.1, ATM P0201384, DWG.5773275. REMOVED CRACKED STIFFENER IAW SRM 51-1-20D PG.21, SRM 51-1-21 PG.1. FABRICATED NEW STIFFENER IAW DWG.5773275. PERFORMED LIQUID PENETRANT INSPECTION IAW DC8 NDT SPM PART 08-00-02/06. CLEANED, TREATED AND PRIMED AREA AND STIFFENER IAW SRM 51-1-8B. INSTALLED STIFFENER WITH NEW FASTENERS IAW SRM 51-1-20D PG.9 AND SRM 51-1-21 PG.1