What was found
LT WING NR 1 ALT TANK, S-59 CRACKED 1.500 (LOWER), NEAR XRS 463.000 (MAJOR REPAIR). PERFORMED MAJOR REPAIR IAW SRM 57-2-2 FIG 3D, 3E, 3F. REMOVED FASTENERS IAW SRM 51-1-21 PG 1, SRM 51-1-20D PG 21. FABRICATED SPLICES (02 EA), CLIPS (02) AND SPACERS (04 EA) IAW SRM 57-2-2 FIG 3D, 3E, 3F. APPLIED TANK COATING MATERIAL TO AREA AND SPLICES AND CLIPS SPACERS IAW SRM 51-1-12 PG 12. INSTALLED SPLICES, CLIPS, SPACERS WITH NEW FASTENERS IAW SRM 51-1-21 PG 1, SRM 51-1-20D PG 9. FOR LEAK CHECK SEE NR 3824.