What was found
DURING C-CHECK, MAIN CARGO DOOR AFT HINGE IS CRACKED (MARKED). REMOVED DAMAGED SECTION AND INSTALLED NEW HINGE SECTION 18 INCHES LONG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-CHECK, MAIN CARGO DOOR AFT HINGE IS CRACKED (MARKED). REMOVED DAMAGED SECTION AND INSTALLED NEW HINGE SECTION 18 INCHES LONG.