Service difficulty report · Floor Support · Boeing 7272J0

Difficulty date
September 20, 2003
Submitted
October 8, 2003
Operation
Air carrier
Aircraft
N749DH
Make and model
Boeing 7272J0
Aircraft serial
22013
Aircraft time
57,226 hours, 28,656 cycles
Part
Floor Support
Condition
Dented
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING C CHECK, PIT FLOOR SUPPORT FROM STA. (50 E TO STA. 990 LBL 14 HAS SEVERAL DENTS. REMOVED DAMAGED FLOOR SUPPORT FROM AFT. PIT STA. 950 E TO 990, LBL 14 I.A.W. B-727 SRM 51-30-2. DRILLED NEW FLOOR SUPPORT P.O. NR 328319, P/N BAC 1500-6199. 3) DIMENSION 5 INCHES, 10 INCHES IAW SAMPLE 51-20-1. 3) ALODINED AND PRIMED IAW B-727 SRM 51-10-2. 4) INSTALLED NEW FLOOR SUPPORT IAW B-727 SRM 51-30-2.

More about the Boeing 727-2J0