What was found
NOSE SECTION EXTERNAL SKIN SHOW INTERIM REPAIR AT STA 32.000, L-32R (MAJOR REPAIR). PERFORMED MAJOR REPAIR IAW ASTAR ED EDU21-12, ASTAR DWG U21-R12. REMOVED FASTENERS AND INTERIM REPAIR IAW SRM 51-1-21 PG 1. TRIMMED OUT IAW ASTAR ED EDU21-12, ASTAR DWG U21-R12. PERFORMED NDT INSPECTION IAW DC8 NDT STANDARD PRACTICE MANUAL PART 6-10-01-001. FABRICATED 2 EA FILLERS AND DOUBLER IAW ASTAR ED EDU21-12, ASTAR DWG U21-R12. CLEANED, TREATED AND PRIMED AREA, FILLERS AND DOUBLER IAW SRM 51-1-8B. APPLIED PRC ON FAYING SURFACES IAW SRM 51-1-11 PG 9. INSTALLED FILLER AND DOUBLER WITH NEW FASTENERS IAW ASTAR ED EDU21-12, ASTAR DWG U21-R12, SRM 51-1-20D PG 9, SRM 51-1-21 PG 1.