What was found
FUSELAGE EXTERIOR REPLACE INTERIM DOUBLER BY A CLASS I REPAIR BETWEEN STA 480.000 - 500.000 L-21R TO L-23R. PERFORMED MAJOR REPAIR IAW SRM 53-2-1 FIG 7 PG 99/108. REMOVED INTERIM REPAIR IAW SRM 51-1-21 PG 1. CUT OUT DAMAGED AREA IAW SRM 53-2-1 FIG 7 PG 99/108. CLEANED, TREATED AND PRIMED AREA IAW SRM 51-1-8B. FABRICATED FILLER AND DOUBLER AND SHIM IAW SRM 53-2-1 FIG 7 99/108. CLEANED, TREATED AND PRIMED FILLER AND DOUBLER AND SHIM IAW SRM 51-1-8B. APPLIED PRC SEALANT TO FAYING SURFACES IAW SRM 51-1-11 PG 9. INSTALLED FILLER AND DOUBLER AND SHIM WITH NEW FASTENERS IAW SRM 53-2-1 FIG 7 PG 99/108, SRM 51-1-21 PG 1, SRM 51-1-20D PG 9.