What was found
FUSELAGE NOSE SECTION EXTERNAL AC POWER RECEPTECALE COMPARTMENT SKIN CRACKED 0.250 AROUND STA -39.000 BETWEEN L-31R AND L-33R. REMOVED FASTENERS. TRIMMED OUT THE DAMAGED SKIN SEGMENT IAW EODHL-030632, ED-3440. PERFORMED NDT INSPECTION IAW DC8 SPM PART 6-10-01-001. CLEANED, TREATED AND PRIMED AREA IAW SRM 51-1-8B. FABRICATED AN EXTERNAL REPAIR DOUBLER AND A FILLER. CLEANED, TREATED AND PRIMED THE REPAIR PARTS IAW SRM 51-1-8B. APPLIED PRC SEALANT ON FAYING SURFACES IAW SRM 51-1-11 PG 9. INSTALLED FILLER AND DOUBLER ON EXTERNAL AC POWER RECEPTACLE COMPARTMENT SKIN (AROUND STA.-39.000 BETWEEN L-31R AND L-33R) USING NEW FASTENERS.