What was found
FWD CARGO COMPT RT TUNNEL LONGERON 26R CORRODED BETWEEN STA180.000 AND STA 200.000 (MAJOR REPAIR). PERFORMED MAJOR REPAIR IAW SRM 53-2-2 PG 1-3 FIG 10-11. REMOVED FASTENERS IAW SRM 51-1-21 PG 1. REMOVED CORROSION ON L-26R. FOUND OUT OF LIMITS. CUT OUT CORRODED AREA, CLEANED, TREATED AND PRIMED AREA IAW SRM 51-1-8B. FABRICATED FILLER AND SPLICE FITTING IAW SRM 53-2-2 PG 1-3 FIG 10-11. PERFORMED LIQUID PENETRANT INSPECTION IAW DC8 NDT SPM PART 08-00-02106. CLEANED, TREATED AND PRIMED FILLER SPLICE FITTING IAW SRM 51-1-8. INSTALLED FILLER AND SPLICE FITTING ON L-26R WITH NEW FASTENERS IAW SRM 53-2-2 PG 1-3, FIG 10-11, SRM 51-1-20D PG 9, SRM 51-1-21 PG 1, SRM 51-1-14 PG 1.