What was found
MAIN CARGO COMPT UPPER FLOORBEAM FLANGE CORRODED, STA 1300.000 RBL 8 TO RBL 16 (MAJOR REPAIR). PERFORMED MAJOR REPAIR IAW SRM 53-2-0 FIG 1G, TR 53-124. REMOVED CORROSION FROM UPPER FLOORBEAM FLANGE AT STA 1300.000 RBL 8 TO RBL 16 IAW SRM 51-1-8 PG 17-18. FOUND OUT OF LIMITS IAW SRM 53-2-0 PG 2P. BLENDED OUT DAMAGED AREA IAW SRM 53-2-0 FIG 1F NOTE 7. APPLIED PRC SEALANT TO BLENDOUT AREA IAW SRM 53-2-0 FIG 1G PAR C. FABRICATED REPAIR ANGLE (EXTRUSION 7075-T6 0.100) AND STEEL STRAP (301 1/4H 0.020) IAW SRM 53-2-0 FIG 1G, SRM 53-7-3 FIG 10. CLEANED, TREATED AND PRIMED AREA IAW SRM 51-1-8B. INSTALLED REPAIR ANGLE AND STEEL STRAP IAW SRM 53-2-0 FIG 1G, SRM 51-1-20D PG 9.