What was found
AFT CARGO COMPT FLOORBEAM UPPER FLANGE CORRODED STA 1320.000 RBL 40 (MAJOR REPAIR). PERFORMED MAJOR REPAIR IAW DC8 SRM 51-2-1 FIG 1 SHEET 9-12, TR 51-130. REMOVED FASTENERS IAW SRM 51-1-20D. REMOVED CORROSION ON FLOORBEAM UPPER FLANGE STA 1320 RBL 40 IAW SRM 51-1-8 PG 17-18. FOUND OUT OF LIMITS IAW SRM 53-2-0 PG 2P. CUT OUT CORRODED SECTION IAW SRM 51-2-1 FIG 1 SHEET 9, TR 51-130. PERFORMED NDT INSP IAW DC8 NDT SPM PART 06-10-01-001. FABRICATED REPAIR ANGLE AND FILLER IAW SRM 51-2-1. CLEANED, TREATED AND PRIMED AREA AND REPAIR PARTS IAW SRM 51-1-8B. APPLIED SEALANT TO FAYING SURFACES IAW SRM 51-1-11 PG 9. INSTALLED REPAIR PARTS IAW SRM 51-2-1 FIG 1 SHEET 9-12, TR 51-130, SRM 51-1-20D, SRM 51-3-1.