What was found
DELAMINATION OF LEFT INBD MID-FLAP, WBL 140 THRU WBL 243, TE. CLEANED AND PREPPED 8 DISBONDED AREAS ON LT I/B MIDFLAP T/E, APPLIED ADHESIVE AND CURED IAW B727 SRM 51-40-21. CUT OUT DELAMINATED AREAS APPROX 4.2 INCHES BY 5.4 INCHES, FABRICATED FILLER APPROX 4.2 BY 6.2 INCHES AND DOUBLER APPROX 3 BY 4.2 INCHES FROM 7075-T6.016, PO NR 9003142. CLEANED, PREPPED, BONDED, CLEAN, TREATED, PRIMED AND SEALED EDGES IAW B727 SRM 57-40-20, FIGURE 3 AND 51-40-24 FIGURE 3.