What was found
FOUND INTERIOR E/E COMPARTMENT, BS 318, RBL 18-24, WL 160, LEVELING COMPOUND BLOWN UP AT FASTENERS BY FRAME WALKWAY BEAM INTERSECTION. REMOVED LEVELING COMPOUND FOR CORROSION EVAL IAW B727 SRM 51-10-6. CORROSION FOUND OUT OF LIMITS AT FRAME SHEAR TIE IAW B727 SRM 53-10-1, FIG 1. CUT OUT DAMAGE ON SHEAR TIE DIM. 5.5" BY 1" IAW B727 SRM 53-10-4, FIG 11. FAB SHEAR TIE USING 7075T6, .063, 5.5" BY .25" IAW B727 SRM 53-10-2, FIG 1. TREATED AND PRIMED PARTS AND AREA IAW B727 SRM 51-10-2. INSTALLED NEW SHEAR TIE IAW B727 SRM 51-30-2 AND 53-10-4, FIG 11. REAPPLIED LEVELING COMPOUND IAW B727 AMM 51-30-00.