What was found
RT ELEVATOR, LWR SKIN IS OIL CANNING ON INBD DRAIN HOLE SKIN, 11 FWD OF ELEVATOR T/E, R ELEV STA 17.20. REMOVED DAMAGED AREA DIM .5 BY .75 IAW B727 SRM 55-20-3, FIG 1. FABRICATED DOUBLER REPAIR, MATERIAL USED 2024T3, 032, 5 BY 5 IAW B727 SRM 55-20-3, FIG 1. TREATED, PRIMED AND INSTALLED REPAIR IAW B727 SRM 51-10-2 AND 55-20-3, FIG 1.