What was found
AFT CARGO COMPARTMENT AT BS 970, BETWEEN STR 28R AND 29R, SHEAR TIE HAS CORROSION. REMOVED FLOOR SUPPORT AT STA.990 TO 950E FOR ACCESS IAW SRM 51-30-2. REMOVED INTERCOSTAL BETWEEN 970-950E FOR ACCESS IAW B727 SRM 51-30-2. CUT OUT DAMAGED AREA AT SHEAR TIE BS970 STR 29R AND 28R DIM 4" BY 2" IAW B727 SRM 53-10-4. FABRICATED SHEAR TIE DOUBLER REPAIR MATERIAL USED 7075T6 .071 PO NR 9004150 DIM 6" BY 4" IAW B727 SRM 53-10-4. TREATED ALODINE AND PRIMED IAW B727 SRM 51-10-2. INSTALLED INTERCOSTAL AND FLOOR SUPPORT AT STA 990 TO 950E IAW B727 51-30-2.