What was found
INSPECT REPAIR AT FUSELAGE STA 490 L-23R PER INSPECTION REQUIREMENTS OF DC8 SRM 53-2-1 CLASS II TYPE REPAIR. REPAIR ACCOMPLISHED AT AIR CANADA AUG 94. PERFORMED MAJOR REPAIR IAW SRM 53-2-1 FIG 7 SHEET 1, 2. REMOVED EXISTING REPAIR DOUBLER IAW SRM 51-1-21. CUT OUT DAMAGED SECTION AND FABRICATED REPAIR DOUBLER INTERNAL FINGER DOUBLER AND FILLER IAW SRM 53-2-1 FIG 7 SHEET 1, 2, SRM 53-4-1 FIG 5C ITEM D, SRM 51-9-0 FIG. 68A. CLEANED, TREATED AND PRIMED AREA AND REPAIR PARTS IAW SRM 51-1-8B. INSTALLED REPAIR PARTS IAW SRM 53-2-1 FIG 7 SHEET 1, 2, SRM 51-1-11, SRM 51-1-21, SRM 51-1-26, SRM 51-1-20D, SRM 51-3-1. THIS IS A CLASS I TYPE REPAIR (INITIAL INSP AT 4000, REPETITIVE AT 4000, REPLACEMENT N/A) IAW SRM 53-2-1 FIG 5, TR NR 53-190 DATED 09-20-03. NEXT INSPECTION AT 36570.