What was found
INSPECT REPAIR AT FUSELAGE STA 280 LONGERON 29R PER INSPECTION REQUIREMENTS OF DC8 SRM 53-2-1 CLASS II TYPE REPAIR. REPAIR ACCOMPLISHED AUG 94. PERFORMED MAJOR REPAIR IAW FAA FORM 8110-3 DATED 11-12-07, ENGINEERING VARIATION AUTHORIZATION NR D853-00023 REV IR DATED 11-05-07. REMOVED EXISTING REPAIR DOUBLER IAW SRM 51-1-21, SRM 51-1-20D. CUT OUT DAMAGED SECTION AND FABRICATED REPAIR FILLER AND REPAIR DOUBLER IAW DWG NR ESD85300023-001-D REV IR. PERFORMED NDT INSPECTION IAW NDT SPM PART 08-00-02 TO 07. NO CRACK NOR CORROSION FOUND AT CUT OUT AREA AND REPAIR PARTS. ENCLOSED SMN FORM 242-4. CLEANED, TREATED AND PRIMED AREA AND REPAIR PARTS IAW SRM 51-1-8B. INSTALLED REPAIR PARTS IAW ASTAR DWG NR ESD85300023-001-D, SRM 51-1-21, SRM 51-1-20D, SRM 51-3-1.