What was found
PERFORMED DETAILED VISUAL INSPECTION OF REPAIR AND FOUND IT TO BE NOT IN ACCORDANCE WITH SRM. PERFORMED MAJOR REPAIR IAW FAA FORM 8110-3 DATED 08-13-07, ASTAR EVA D853-00013-001-D REV IR DATED 08-08-07. REMOVED NON STANDARD REPAIR IAW SRM 51-1-21, SRM 51-1-20D. VISUALLY INSPECTED L-23L AND FOUND 3/4 INCH CRACK. CUT OUT LONGERON DAMAGED SEGMENT P/N 2704877 AND FABRICATED NEW SEGMENT (EXTRUSION 7075T651, P/N S264145ST) AND SPLICES P/N 2641454 IAW SRM 53-4-0 FIG 28 SHEET 1 ITEM "J" SRM 51-2-0 FIG 50 (SHEET 70), SRM 53-2-2 FIG 10, TR NR 53-153 DATED 12-10-02. FABRICATED REPAIR DOUBLER (AL7075T6 0.090") AND FILLER (AL7075T6 0.080") IAW ASTAR EVA D853-00013, DWG ASTAR ES D853-00013-001-D. PERFORMED NDT INSPECTI