What was found
DURING C CHECK, FRAME SHEAR TIE CORRODED AT BS 720C BETWEEN STRINGERS 28L AND 28R. FOUND CORROSION ON SHEAR TIE OUT OF LIMITS IAW SRM 53-10-1 FIG 1. FABRICATED NEW SHEAR TIE IAW SRM 51-20-1, 51-20-2, 51-30-5 AND 53-10-2 FIG 3. ALODINE AND PRIMED ANGLE IAW SRM 51-10-2. INSTALLED NEW SHEAR TIE IAW SRM 51-30-2, 51-40-3 FIG. 1 AND 53-10-4 FIG 15.