What was found
DURING C CHECK, CORROSION NOTED ON STRINGER 27R REPAIR CHANNEL, BS 560 TO BS 573. REMOVED FASTENERS IAW SRM 51-30-2. REMOVED CHANNEL IAW SRM 51-30-2. FABRICATED NEW REPAIR IAW SRM 51-20-1, 51-20-2, 51-30-2, 53-10-2 FIG 9 AND 53-10-3 FIG 1. CLEANED STRINGER AREA IAW MM 12-40-00, NO CORROSION NOTED IAW SRM 51-10-6. ALODINE AND PRIMED REPAIR IAW SRM 51-10-2. INSTALLED CHANNEL IAW SRM 53-10-3 FIG 2.