What was found
AT C-CHECK, FOUND CORRODED FLOOR SUPPORT BEAM, BS 360 TO 400 LBL 24. FABRICATED AND INSTALLED CABIN FLOOR SUPPORT PER SRM 51-10-1, REPAIR 20 LONG.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT C-CHECK, FOUND CORRODED FLOOR SUPPORT BEAM, BS 360 TO 400 LBL 24. FABRICATED AND INSTALLED CABIN FLOOR SUPPORT PER SRM 51-10-1, REPAIR 20 LONG.